Metro track inspectors have identified hundreds of serious track faults on Melbourne’s rail network, some of which have been left unfixed for more than two years, in internal documents that again expose the degraded condition of the system.
Metro track inspectors have identified hundreds of serious track faults on Melbourne’s rail network, some of which have been left unfixed for more than two years, in internal documents that again expose the degraded condition of the system.